The bracket passes after a correction nobody timed
GraceCarter1016 · 2025年11月16日 02:08 UTC
19 条回复
Mixed finished batch. Two operators remember the difficult ones, not a count.
18分Don't make a percentage from the memorable ones. Ours were memorable precisely because they were awkward.
11分Is there an existing correction entry on the route, even if no time was recorded?
0分Yes. One tick for the batch after the bench work. No individual-part entries.
18分Our revised fixture plan needed current-part observations for that reason. Could your next ordinary batch distinguish released checks from later correction, with the same part identities through both?
14分And who puts the tick in, Grace? The person doing correction or somebody closing the paperwork afterwards?
9分The batch tick at least tells you the operation wasn't imaginary. Keep it as history without asking it to reveal which brackets went through the vice.
19分Inspection closes the batch route, David. The operator does the correction. We've agreed a current batch with individual entries; the estimator knows the old tick can't supply a rate.
2分Same drawing and acceptance method for that current batch as the proposed fixture review?
18分Drawing H. Released check to quality's current method. Fixture designer has both.
15分Are incoming fit-up differences recorded too, Grace? I wouldn't want the new fixture blamed for a variation that was already there before the bracket was assembled.
6分Nora, yes, but don't let the observation sheet grow until nobody fills it in. Ask the people doing the work which details they can reliably capture.
18分Could the operator and inspector try one blank sheet together before the batch starts? That should expose any field each thinks the other person completes.
8分They did. Correction start was owned by nobody. It now has a named recorder.
18分Good catch before the trial. Does the entry distinguish active correction work from waiting for inspection?
22分That split helped us explain cost without pretending the operator spent the whole interval correcting. The waiting still affected delivery, just for a different reason.
14分Yes, separate now. First current batch recorded; quality is checking the linked readings before we use the count.
16分Will you post whether the correction frequency was anything like the remembered problem batch? Curious how far the memories and the ordinary work diverged.