Our proposed FR5 vacuum tool seals on one access panel laid flat on a bench. Production supplies a stack. The trial sheet says pickup successful, but says nothing about whether another panel comes with it or how the thin panel is supported on the way to the nest. I need those questions answered before operator training starts.
Our panels arrive with a light process film and occasionally slight bow. Those were absent from the demo samples. I've asked for representative stack conditions in the revised assessment.
How does the proposal confirm that exactly one panel is delivered? That should be a defined function with an appropriate response when the result is uncertain.
It currently relies on the vacuum indication. No separate single-panel confirmation described. Tool supplier is being asked to propose and justify one.
And check the panel shape during transfer and release. It may seal beautifully near the cups while an unsupported corner gets somewhere nobody intended.
Added support and release into the nest to the trial scope. No method selected yet. The operator recovery for a suspected pair is also an open design item.
Who will review that recovery with the operator team? A detected pair still leaves a physical situation for someone to handle, which should be resolved before the handover is called complete.