Our inspection-sample tooling stays unfitted. I've requested the delivered FR5 interface drawing, not another equivalence assurance. Three days waiting.
Give the supplier your confirmed drawing revision with the delivered label and seating-face photographs. Ask the fixture designer to compare the actual interface before deciding whether this package suits the tooling.
Has the supplier offered an identified replacement configuration? Ask for its drawing and a clear proposal for the delivered package too, so the next shipment does not repeat the same uncertainty.
Louis, any answer on that proposal? The tooling can remain unfitted while purchasing sorts it out, but the person scheduling installation needs to know whether there is a real supply option yet.