Arm and gripper priced. Fixtures still vague. (fixture loading)

HanaChan1057 · 2026年4月20日 22:18 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

HA
HanaChan1057
I'm pushing for Universal Robots UR5e to do fixture loading with a small plastic enclosure in a small owner-run workshop, starting with 221. I priced the arm and gripper. Fixtures and staff time? Much vaguer. My colleague's annoyed, fairly enough. I'd like a small pilot we can both judge.

2 条回复

EL
EllaAllen0294

Have you measured the whole manual job, preparation included? Timing just the transfer could hide the same missing labour again.

2分
HA
HanaChan1057

@EllaAllen0294 We watched a batch. Preparation took longer than transfer. My estimate had basically made that work disappear by wishing.

12分

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .