Have packaging mark required bearing on the actual filled box, pallet deck and lower layer.
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
Where do our turned UR5e product boxes actually bear?
JoArcher0418 · 2026年8月23日 21:26 UTC
19 条回复
Does the drawing show the tool during release among already placed boxes, or only the final arrangement?
4分Include short-order finishing and removal conditions. The shift may have to handle a pallet before the attractive final pattern exists, and that isn't answered by a successful last placement.
19分Keep those requirements on one candidate revision. I mean the support section and the movement sequence must describe the same arrangement, not two individually sensible proposals joined by the same carton count.
-1分Only the final layer is shown. Packaging has the filled-box details; complete hand and intermediate placements are requested.
9分Has packaging identified a conflict, or merely received the information?
7分Conflict identified: one required bearing strip crosses an unsupported gap. Original pattern is held, not accepted.
5分Would the proposed remedy change the packing support or the carton positions? Those may require different owners and costs. Don't let a drawing label such as intermediate sheet imply an available, assessed operation.
2分Designer proposed a support sheet between layers. No sheet specification or handling method yet, so it's an option, not a remedy.
12分Who places the sheet, and where are replacements stored? If the answer is the operator, that becomes repeated work and access to assess, not a line you can hide under packaging consumables.
3分Does packaging say what the sheet must achieve across the gap? Choosing a material before defining that requirement could give you a cheap item that doesn't solve the support problem.
14分And the tool still needs its full release check with the sheet and neighbouring boxes present.
16分Packaging has specified the required support function, not selected a sheet. Operations won't accept an unassessed manual insertion step.
8分Then compare that complete sheet-handling option with a changed layer arrangement, including their different work and space demands. You do not yet have grounds to call either cheaper; omitting a task from one estimate would manufacture that result.
19分Project owner asked for both scoped alternatives. The original maximum carton count is now marked unapproved in purchasing's estimate too.
14分Good, but is a short-order outcome included in both alternatives? It can disappear when the discussion turns into full-layer count versus sheet price, although dispatch still has the same unfinished pallet to handle.
11分Who will keep the candidate identifiers common when those alternatives return from different suppliers?
13分Integrator owns the common revisions. Both scopes include the permitted short-order condition; neither alternative has completed support and tool review.
-2分Then retain the hold on the original and the two open alternatives separately. No selected layer yet.
17分