简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

What does inspected cover on this refurbished UR5e offer?

JamieBennett0730 · 2026年7月30日 23:41 UTC

回复讨论
JA
JamieBennett0730
I'm considering a refurbished UR5e for polymer-puck tray loading in our compact room. Price is tempting, but inspected comes with no scope. Before paying for collection, what records should establish the condition and included package rather than leave me planning from a listing adjective?

2 条回复

DA
DanielAllen0304

Ask for the dated inspection scope and results tied to the actual equipment identities, refurbishment history, complete included-items list and written support terms. Agree any further qualified assessment before payment and collection; equipment condition evidence remains separate from suitability of your puck-handling application.

16
JA
JamieBennett0730

I have requested those records and an itemised package list. Nothing received beyond the listing yet, so I have not paid or arranged collection.

13

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。