can I compare quotes by what finished looks like?

TomasGripper_9974d8 · 2026年9月21日 09:12 UTC

回复讨论

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

TO
TomasGripper_9974d8
The more quotes I read, the less useful the word commissioning becomes. I am making one list of what each supplier says will be working at the end, what evidence they will leave, and what I have to provide first. Is that a reasonable way to compare them, or is there a better short checklist for a first cell? I am not after a perfect acceptance document, just a way to spot the empty promises.

3 条回复

CH
ChloeCarter1005

Use the same headings for every quote and make each supplier fill the gaps. Include dependencies on your side, because a quotation can look complete while assuming the network, machine interface or data is already ready. That is where comparisons usually go soft.

0分
TO
TomasGripper_9974d8

Right, the list needs a column for assumptions, not only deliverables. I was treating the missing detail as a question to ask later. Putting it next to the price will make it much harder to ignore.

0分
NI
NinaAbbott0066

Keep 'not answered' different from 'excluded'. I'd hate to see a blank turn into a zero-cost assumption just because the comparison sheet needs a tidy total. Or, more precisely, let the total stay visibly incomplete until the missing scope has an answer.

0分

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 和 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。