On a different tray job from the spacer problem, our UR5e now lifts aluminum pucks at an angle. I have retained the filmed pucks and saved the pickup versions; the shift is asking who will check the tooling before another correction becomes normal.

15 条回复

IM
ImranBrown0914

Our shift once had three people nudging the same pickup and nobody booked the tooling check. I'd ask the maintenance lead for a named person and a slot, not another group email.

2
JA
JaneCarter1032

Maintenance has a slot. The question is whether tooling or controls leads it; each thinks the other changed something first.

0
SO
SofiaBell0630

Have them attend together for the first comparison. The order of changes may matter, but settling whose fault it is before looking will use the whole slot.

10
AN
AnnaBell0677

Who can authorise keeping the job stopped if the comparison is inconclusive?

6
JA
JaneCarter1032

Production lead can hold the job. Tooling will lead the isolated physical check with controls there for the version history. I have asked for both findings, even if neither explains everything.

19
SA
SamBrooks0855

Do the retained pucks sit squarely in the empty tray when checked without the gripper? That seems a useful comparison before people argue over robot coordinates.

12
IM
ImranBrown0914

Sam, yes, and Jane has already kept the troublesome pieces. Our mistake was fetching a fresh box for the check because the original batch had gone.

6
SO
SofiaBell0630

Jane, did the booked check happen?

20
JA
JaneCarter1032

Yes. Sam, the pucks sit squarely. Tooling found uneven contact on one finger face; its history is unclear. The job remains held while they specify the replacement and review the offsets.

1
SA
SamBrooks0855

Thanks, Jane. Was that contact visible on the same pucks that tilted, or on a separate bench sample?

6
AN
AnnaBell0677

And who is following the replacement request now? The original owner question should not return disguised as a parts order.

23
JA
JaneCarter1032

Sam, the retained tilted-pick pucks. Anna, maintenance owns the parts request. Controls has identified which pickup changes need review with the restored tooling.

18
IM
ImranBrown0914

Sounds less circular now. Has production agreed what it needs to see before taking the job back?

10
JA
JaneCarter1032

Production and maintenance have agreed a witnessed handling check using retained and representative pucks after the tooling work. No result yet; replacement fit and trial remain outstanding.

19
SO
SofiaBell0630

Put the result in the shift handover when it happens, including any remaining restriction. Otherwise the next operator only hears that someone has changed the fingers again.

4