简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

Why does our FR10 layer approval use the wrong packed carton?

AaronBrown0871 · 2026年3月30日 19:46 UTC

回复讨论
AA
AaronBrown0871
The alternating layer fits our dispatch carton outline, but its turned positions leave the reinforced bearing edges above gaps. Packaging's attached approval names an earlier internal packing construction. I cannot carry that approval into the FR10 tooling choice merely because the outside label has stayed the same.

10 条回复

HA
HazelAli0223

Has packaging identified the construction actually arriving on your line?

25
AA
AaronBrown0871

Yes. Current packing uses two end supports; the earlier construction distributed support differently. The outer carton and product label did not change, which is how the old approval entered this review.

4
EM
EmmaChan1072

Then the current carton needs its own support review with tooling. I wouldn't assume the old pattern fails everywhere, but the old approval cannot answer the turned positions you describe.

25
HA
HazelAli0223

Can the packer distinguish those constructions when old stock is returned?

1
AA
AaronBrown0871

The packing reference is on the inner label, not the dispatch face. Returns are checked by packing before use; we have not proposed mixing unchecked cartons into this job.

7
JA
JackBrown0950

We added a packaging identification step to a workstation once and nearly hid it inside the word prepared. If that returns check is already part of your normal job, retain it in the comparison. Don't make the robot proposal appear to do it.

4
EM
EmmaChan1072

Jack, yes, though Aaron has named an existing check. I'd concentrate the new work on the support and tool exit until someone actually proposes changing how returns are handled.

10
AA
AaronBrown0871

Packaging and tooling have the current filled sample and the same layer section now. The first review is still outstanding. I have removed the old approval from the candidate's accepted-evidence column.

16
AA
AaronBrown0871

And thanks, Hazel, for the returns question. It belongs in the handover description even though we are not adding that task for this proposal.

5
JA
JackBrown0950

Fair enough, Emma. I wasn't asking for another process change. I would want the existing packer's work visible when Aaron compares the whole job, rather than rediscovering it after a transfer-time estimate wins the argument.

14

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。