简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

One inspection coupon produces a second acceptance after reconnect

CalebBarnes0580 · 2026年3月24日 03:55 UTC

回复讨论
CA
CalebBarnes0580
Our FR5 inspection bench reports the same coupon twice if the reporting application loses its connection after acceptance. I can see completion high before the outage and still high when the application returns. The operator has not presented another coupon. The screen starts a fresh session, but the job reference displayed beside the second acceptance is unchanged. What should I ask the application developer to trace between receiving that retained state and adding the second entry? I don't want a reconnect to become permission to repeat the inspection.

0 条回复

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。