I am carrying the preparation lesson from our earlier trials into this connector-kit packing estimate: people and changeovers are included from the start. The FR5 proposal still leaves presentation fixtures and part of the installation unpriced. How should I compare two totals without letting those blanks pretend to be savings?
Compare matching scope lines, with unknowns marked and owned. Do both offers include the same handover?