the FR5 packing estimate still has unpriced fixture work

CallumBrooks0795 · 2025年11月13日 17:46 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

CA
CallumBrooks0795
I am carrying the preparation lesson from our earlier trials into this connector-kit packing estimate: people and changeovers are included from the start. The FR5 proposal still leaves presentation fixtures and part of the installation unpriced. How should I compare two totals without letting those blanks pretend to be savings?

1 条回复

SO
SofiaBrown0891

Compare matching scope lines, with unknowns marked and owned. Do both offers include the same handover?

12分

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .