简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

Fairino FR10: I've got screenshots but no revision trail

MeiArcher0429 · 2026年8月5日 21:01 UTC

回复讨论
ME
MeiArcher0429
I'm preparing our sample verification handover for Fairino FR10 in a maintenance review of a commissioned inspection cell, using a sample housing. The notes are mostly pendant screenshots without revision details. They show the main routine but omit subprograms, fixture assumptions and expected ordinary PLC signals. I need a usable structure while the original integrator is still available

1 条回复

EL
EllaAllen0294

@MeiArcher0429 Start by identifying the installed program revision and its corresponding controlled export. Can you establish that link before describing the routine's dependencies?

17

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。