简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

fr10 connector stop has outlasted another request for video

OmarBrooks0839 · 2026年6月23日 05:52 UTC

回复讨论
OM
OmarBrooks0839
Our Alibaba FR10 connector-unloading package stops intermittently; 33 days into the ticket, the seller has my phone clip and wants details, but hasn't said which missing observation would help.

13 条回复

PR
PriyaIO

What can be read in the clip at the occurrence: message, active step, or neither? Start with those limits. The installed revisions and fixture identity can accompany it now, but the event evidence needs to describe the same stop rather than a collection of plausible screenshots.

5
OM
OmarBrooks0839
回复 PriyaIO

Neither; the connector is held above the tray and the phone turns towards the screen only after the message closes.

6
HA
HanaBarnes0535

Then the clip is a physical observation, not a complete sequence trace. Was there any separate occurrence time recorded, or would someone have to guess which history entry belongs with it?

15
OM
OmarBrooks0839

I noted the approximate time, not seconds; several entries in that period look possible, so I haven't assigned one.

8
KA
KaiBrooks0802

That uncertainty should remain visible; I once had to correct a screenshot description because it belonged to another fixture, and matching-looking information would not have made it the same occurrence.

13
LU
LuisChan1130

Who is the technical recipient, Omar? Someone needs to tell you which retained history they can use.

6
PR
PriyaIO

Luis, yes. I'd send the approximate time with the candidate entries clearly identified as unassigned, and ask the technician what could establish a unique match. If nothing can, agree the next capture rather than polishing an uncertain event into a false complete one.

14
OM
OmarBrooks0839

Sales has now named a technician; I've sent that limited occurrence account and asked whether the retained entries can be distinguished.

14
HA
HanaBarnes0535

Does that technician have the actual program revision? A step description can change between revisions, and a phone view of the held connector won't tell them which sequence your installed package was using.

2
OM
OmarBrooks0839

Yes, installed program and controller revisions are included, with fixture identity; no answer to the event-matching question yet.

16
LU
LuisChan1130

Have they confirmed opening the attachments, not just receiving your message?

16
PR
PriyaIO

For any later normal supervised occurrence, arrange a readable message and step, the preceding action, and the relevant retained history with its clock source. The shift collecting it needs to know not to merge a later stop with this unresolved one simply because the arm waits in the same place.

6
OM
OmarBrooks0839

Attachment access is confirmed, Luis; the technician wants the next occurrence's active-step history, so our capture request is specific now, but this stop is still unexplained.

4

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。