Get packaging and the gripper supplier looking at it together, otherwise each is waiting for the other to approve the space they need.
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
Carton supports versus the second layer
JoBarnes0592 · 2025年4月30日 00:23 UTC
18 条回复
Meeting booked. Bringing a packed carton instead of another empty rectangle.
21分Actual pallet too, or its measured board layout.
18分Does the carton drawing identify which strips carry the contents? A visible fold underneath may not be the support feature you think it is. Packaging should confirm that before the discussion gets too far.
4分Yes, packaging confirmed the two loaded strips from the insert section. That part isn't my guess, luckily.
9分Match that section to the current carton revision and contents. I have seen similar outside boxes carry the load differently after an insert change, so the physical sample and the drawing need to describe the same package.
0分Which carton revision is on your sample, Jo?
6分Revision D, same as the section from packaging. Supplier had modelled revision B, so that's now being corrected.
17分What changed between B and D? We had to check the packaging revision on our own layer review before the tool outline was useful.
6分Insert position. Outside box dimensions stayed the same. The supplier now has D and says one corner release is tight with the current fingers.
15分Do they have the surrounding placed cartons in that view?
17分And show the fingers withdrawing. The carton still being held above its spot is the easy picture.
19分They've added neighbours and withdrawal. Current pattern doesn't leave room. Packaging is considering a lower-count layer, toolmaker is considering shorter fingers. Neither option approved.
6分Can the shorter fingers still reach the required contact area on the carton? I would want that checked on the packed sample rather than inferred from the extra clearance.
11分Still being checked. No sample trial yet; the lower-count layer also needs packaging to look at the full stack.
23分Include whatever sheets and restraint the finished unit load requires in that stack review. Approving a layer in isolation could leave the dispatch arrangement incomplete.
2分Has planning priced the lower-count option? Might be cheaper than clever fingers.
12分They are comparing it now. I've held the tooling order until one whole arrangement survives packaging, handling and dispatch review. Bit less pretty than the first drawing, much more useful.
23分讨论已关闭
此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .