Which bracket measurement happened before the correction?
OliverCarter0972 · 2026年8月15日 05:36 UTC
19 条回复
Keep the drawing revision beside it. Otherwise even matched measurements may answer different requirements.
16分And preserve the measuring supports. A dimension recorded in restraint isn't interchangeable with a released inspection just because the feature name matches.
8分I can follow two assemblies by their traveller numbers. One has a released result, then a correction entry, then an accepted result. The other only has the accepted sheet.
2分Then the first assembly gives you a documented sequence, not an uncorrected process result. The second leaves that sequence unknown. I would not combine them into an average for selecting the new fixture.
12分Does the correction entry say what was done, or is it just a signature beside the word?
13分You could ask the operator who signed it, with the actual sheet in front of them.
13分Alex, yes, but don't turn a remembered explanation into a missing measurement. It can describe the method without reconstructing the amount.
18分It is just a signature. The former operator has agreed to talk it through with fabrication and quality. I've marked the pre-correction measurement as available only for the first assembly.
22分Hana, agreed. I meant identify the operation, not ask them to remember a number.
13分Incoming fit-up is still absent from this discussion. Does either traveller show preparation before the assembly was loaded? A released failure may be real while its starting condition remains undocumented.
21分Only a general fit-up tick. No gaps or component measurements. That's another missing stage, and it affects both assemblies.
13分Did the operator meeting clarify what the tick actually covered?
13分Yes. They checked that the prepared pieces could be assembled, but sometimes dressing happened first. The correction signature referred to a separate post-release operation. Quality has now split those stages in the proposed study sheet.
17分Thanks for reporting the preparation too. It would have been easy to omit that from the new handover.
18分That still does not establish that dressing caused the later dimensional error. Keep it as a process dependency to investigate, not the explanation you've finally found.
10分The useful outcome is that the new study can observe the stages separately. It needs agreed inspection methods as well as boxes for values, or different supports may create another set of incomparable records.
6分Who approves that study sheet before the cell specification uses it?
22分Fabrication and quality approved the recording plan today, including supports and drawing references. The old accepted figures are no longer being used as evidence of uncorrected output. We still need the new study before choosing the fixture scheme.
12分