简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

our FR10 case layout turns the loaded side across a gap

AnnaCarter1025 · 2026年8月21日 01:05 UTC

回复讨论
AN
AnnaCarter1025
The alternating FR10 pattern fits our component cases neatly, but their preferred support direction is crossed in some rotated positions over gaps. I want packaging and tooling to review it together. What should the packing department put into that review beyond the finished-layer drawing?

17 条回复

MI
MinaAdams0163

Show the packed case, not only its outside rectangle. Packaging needs to identify where the contents load it before anyone draws a convenient support underneath.

15
PA
PavelBrooks0788

What does the complete tool do when it opens beside the cases already placed?

7
RA
RaviBennett0737

Both views need the same underlying layer. Otherwise one person checks a support that the other person's opening fingers pass through, and the disagreement arrives after the layout has acquired a price.

12
AN
AnnaCarter1025

The current drawing has the cases but no opening-finger sequence. Packaging supplied a direction arrow, not the actual bearing regions. I have asked both owners for those missing details.

6
LU
LuisAbbott0086

Does that direction arrow apply to the packed contents as proposed? I would retain the packing revision beside it rather than treat the same external case size as the same load.

17
MI
MinaAdams0163

And who finishes a part layer when an order ends? Our extra pallet work was invisible until dispatch described it.

21
PA
PavelBrooks0788

Mina, do you mean a different robot pattern or manual finishing after removal? Those need different information in the review.

20
AN
AnnaCarter1025

We currently remove partial pallets at order end. The proposal does not say whether that changes, and the packing revision behind the arrow is not identified.

17
RA
RaviBennett0737

Then ask dispatch to describe the partial states it actually moves. That can be done while packaging traces the arrow; no need to wait for a finished tool model to discover the operating requirement.

20
MI
MinaAdams0163

Pavel, I meant the existing removal and finishing work, not permission to reach into the cell. Anna's dispatch answer is the right starting point.

14
LU
LuisAbbott0086

Have you found who issued the arrow? The underlying requirement may be perfectly sound while its connection to this packing revision is missing.

13
AN
AnnaCarter1025

Packaging says it came from an earlier insert arrangement. They are checking the current packed case instead of carrying that requirement across without explanation.

13
PA
PavelBrooks0788

That does not make the rotated positions acceptable yet. It means the support question has to be answered for the actual case.

8
RA
RaviBennett0737

Keep the supplier drawing as a proposal while those answers are collected. A corrected reference can change the review, but it is not itself a load assessment or a release-clearance result.

6
AN
AnnaCarter1025

I've changed the review note to identify the unverified packing basis. Dispatch is listing the partial-pallet conditions; tooling still owes the occupied opening and withdrawal views.

23
LU
LuisAbbott0086

Can packaging keep its eventual bearing explanation with the actual packing revision, so this arrow does not become untraceable again?

22
AN
AnnaCarter1025

Yes, they have agreed that record. Thanks, Luis; the old arrow looked authoritative enough that I had stopped asking where it came from.

8