Which bracket measurement should replace our clamped inspection sketch?

JaneBennett0771 · 2026年1月1日 08:13 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

JA
JaneBennett0771
I found two inspection sketches for the gusseted bracket we want to weld with an FR5. One measures the flange against a fixture face while clamped. The drawing requirement is between features on the released bracket. The old operator remembers correcting parts afterwards, but the sketches make that work disappear. How should I organise one useful comparison for fabrication and quality?

1 条回复

CA
CallumBennett0708

Follow one identified bracket through both checks with those people, because your sketches aren't measuring the same relationship. We had a bench sheet where the fixture was effectively being inspected every time somebody wrote part square. The released part had another opinion. Get the actual drawing revision beside the sketches, have quality identify its datums and final check, then let fabrication explain the locating contacts and any correction between checks. Don't make the apprentice guess which old sketch meant finished.

20分

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .