简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

Both quotes omit the adapter from the weight

EmmaCarter0985 · 2025年6月22日 09:03 UTC

已关闭
EM
EmmaCarter0985
I'm comparing FR5 tooling for our aluminium housings. Both summaries list the housing weight, but neither includes the long fingers or adapter. What complete loading information should I request?

15 条回复

JU
JuliaBrown0935

Ask for the mass and loading details of everything carried at the flange, with and without the housing. Then have the integrator check the proposed assembly and motion against the robot guidance. Include the fittings they expect you to add later

17
EM
EmmaCarter0985

One supplier says their gripper is light enough that the adapter won't matter. They haven't given me the adapter dimensions. Is a preliminary estimate useful at this stage?

10
JU
JuliaBrown0935

Useful for screening, provided it includes an allowance based on a real proposed design. I wouldn't release the tool order with the adapter still missing from the calculation

11
HA
HarishAbbott0054

Ask what adapter they estimated. They may have assumed a short plate while your fixture requires a stand-off. That could explain the casual answer.

22
JU
JuliaBrown0935

And ask whose job it is to supply it. We once had two quotes which each expected the other contractor to provide the same small but rather necessary bracket

7
LI
LiamBrooks0838

The flange loading also depends on where the mass sits. Request centre-of-gravity information and the other loading information required for the manufacturer's assessment. Long fingers deserve more attention than a total mass entry.

9
DA
DavidArcher0432

But don't turn the first quote into a demand for finished drawings of a tool they haven't designed yet. Ask them to state the assumed arrangement and price the design work. Otherwise you get a beautifully precise guess.

18
EM
EmmaCarter0985

Thanks. Harish was right: the first supplier assumed a flat adapter, while our sketch shows a stand-off. I've sent both suppliers the same fixture section.

12
JU
JuliaBrown0935

That should make the comparison less slippery. David, I agree on paying for design, but I still want a clear point when those estimates must be replaced before we commit to manufacture

13
DA
DavidArcher0432

Yes, a design review before manufacture. I just wouldn't reject a supplier for not knowing the final centre of gravity before there's a final tool. Reject the one pretending it can never matter.

4
EM
EmmaCarter0985

The second supplier has offered a paid layout stage. The first is revising the estimate. I'm comparing those stages now, not just the two hardware prices.

15
LI
LiamBrooks0838

Include the empty-tool state in that review as well. And identify who updates the robot's load configuration after the tool design is confirmed or later modified.

0
EM
EmmaCarter0985

Our integrator will own the configuration. They also want the hose arrangement shown because it changes the available space near the nest.

15
EM
EmmaCarter0985

We have agreed a layout review before either tooling design goes to manufacture. Purchase decision is still open. Both suppliers now have the same stand-off requirement.

5
HA
HarishAbbott0054

Useful progress for a few emails and one section drawing. Please let us know whether the stand-off changes which proposal looks better.

14

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .