@AdaBrown0912 Compare the specified inspection condition and reference supports with the historical sheets. Do individual measurements identify whether the assembly was restrained or released?
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
Fairino FR10: What should count as dimensional acceptance after welding?
AdaBrown0912 · 2026年5月7日 17:51 UTC
I'm reviewing historical records for our planned reviewing fixtures for welded mounting brackets with Fairino FR10 and a gusseted angle-bracket assembly in a welded-bracket fabrication workshop.
The notes describe alignment under restraint but dimensions outside the drawing requirement after release.
I'd like to distinguish incoming fit-up, fixture location and final acceptance before carrying an unexplained correction routine into the new cell; no live welding adjustments are involved.