How should I label two views of the same accepted bezel?

AlexAdams0124 · 2025年8月15日 15:05 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

AL
AlexAdams0124
Our FR5 inspection folder calls one bezel both scratched and clean, depending on the camera view. Quality accepted the actual piece. How should I label these for the vision developer?

4 条回复

NO
NoraAli0235

Use its accepted decision on both, with the view identified. Don't relabel the part from glare.

22分
AL
AlexAdams0124

Thanks, Nora. The mark moves when we reseat it; I've linked both views to bezel B4.

19分
NO
NoraAli0235

Keep the seating problem visible in your notes too. Correct labels won't make presentation repeatable.

17分
AN
AnilAli0201

Did B4 rock in the nest, or settle differently without any obvious movement?

8分

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .