When our monitor reconnects, a completion signal retained from before the outage can be treated as a new completion. We're tracking sample verification tracking with Fairino FR10 in a fixture-checking station under commissioning, using an inspection coupon.
I'm trying to reconcile the signal with its job, without automatic resubmission or simply clearing the retained state.
Does your trace show completion staying high through the outage? And does the application retain what it already consumed?