When our monitor reconnects, a completion signal retained from before the outage can be treated as a new completion. We're tracking sample verification tracking with Fairino FR10 in a fixture-checking station under commissioning, using an inspection coupon.
I'm trying to reconcile the signal with its job, without automatic resubmission or simply clearing the retained state.
Our Fairino FR10 completion tracking forgets what it already saw
NoahAbbott0020 · 2026年9月3日 19:05 UTC
主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文