Our Fairino FR10 completion tracking forgets what it already saw

NoahAbbott0020 · 2026年9月3日 19:05 UTC

回复讨论

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

NO
NoahAbbott0020
When our monitor reconnects, a completion signal retained from before the outage can be treated as a new completion. We're tracking sample verification tracking with Fairino FR10 in a fixture-checking station under commissioning, using an inspection coupon. I'm trying to reconcile the signal with its job, without automatic resubmission or simply clearing the retained state.

1 条回复

BR
BrunoChan1061

Does your trace show completion staying high through the outage? And does the application retain what it already consumed?

18分

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 和 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。