While documenting our planned interface for Fairino FR5 handling a turned spacer blank during documenting a machine-tending interface in a planned enclosed machining cell, I've found that the suppliers use 'ready' differently. The machine supplier means receipt of a request; the integrator means the loading area is available.
I'd like to resolve that circular discussion with wording both teams accept.
@AlexBrooks0820 Can you put the two definitions beside each other, with the sender and receiving system named? Start with that single disputed transition.
@AnikaBennett0769 Both list a machine-to-robot signal. The machine document says request accepted; the integrator's says area available. They agree on the arrow and disagree on what happened.
@LucaAllen0265 Fair correction. Those rows alone don't settle the handover. Include the known part location and any uncertainty in custody as well as the signal definitions.
@AnikaBennett0769 There's a single transfer box in our sequence, with no part-location detail. Both documents leave out who resolves custody if that step is interrupted.
@AlexBrooks0820 Name the responsible role in the table and reference the procedure there. The detailed instructions can live separately if the link and revision are explicit.
Unfortunately, that describes our notes fairly well. One assigns machine recovery; the machine document sends interrupted transfers back to the integrator.