Carton supports missing from our tidy UR5e pallet picture
GabrielBarnes0540 · 2026年6月11日 04:14 UTC
21 条回复
We have the support specification. Drawing uses solid boxes everywhere. I'll have packaging mark the real load-bearing areas.
16分Does alternating have to stay, or can the layer pattern change?
24分Can change. Customer specifies the packed product and delivery conditions, not this pattern. We picked it for count.
17分I would compare an aligned arrangement before buying special tooling. Maybe it loses count. Maybe it saves a lot of awkward handling. You need packaging to assess the full load either way.
12分Has anyone priced a different tool opening direction? That might preserve count, if feasible.
9分Not yet. I have asked the tool supplier whether there is a suitable alternative. No proposed design back.
13分Show both ideas in the comparison, without assigning imaginary savings to either. The aligned pattern needs a load assessment; the changed tool needs an actual proposal and access review
24分Does dispatch move incomplete pallets too? Our last layer was the part everyone forgot when evaluating a very convincing full stack.
21分Yes, partial orders happen. Thanks Isabel, I'll include them in the handling conditions. The demo plan only described full pallets.
21分And who decides where the final few cartons go when the layer is incomplete?
6分Dispatch currently follows a manual packing instruction. We haven't defined the robot's partial-layer pattern. Another open item rather than leaving it to the operator.
15分Keep that instruction available to packaging. It may explain practical constraints the new drawing omitted.
15分Has the shared drawing come back with the tool open? I'd want to see that before assuming the proposed spacing fixes anything
17分Yes. Original pattern conflicts with the opening fingers at an end position. Lower-count candidate is now drawn. Neither has a full handling assessment.
20分Is the lower count reflected in your throughput estimate? People tend to remember the original attractive number long after its layer drawing is withdrawn.
9分Updated. Planner says it may still work for our demand, but wants the actual release and cycle review before settling that.
13分Any answer on the alternate tool, then?
9分Supplier can propose changed fingers, cost still pending. Packaging needs to see their effect on spacing. We haven't selected between the candidates.
18分Who owns keeping those revisions together? A changed finger can invalidate an earlier clearance picture.
25分