Our bracket-inspection application misses the PLC's brief request, and the handover does not say which side clears each ordinary job state; I want both authors to agree the matching receipt and restart cases before this reaches the covering tutor, with the independently engineered safety functions left separate.
Our UR5e inspection handover leaves request clearing to guesswork
HenryCarter0960 · 2026年4月8日 07:42 UTC
主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文
0 条回复
讨论已关闭
此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .