Our bracket folder lost the change to its locating stop

CallumChen1143 · 2026年4月14日 08:51 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

CA
CallumChen1143
I found a stop-change note between the old bracket inspection sheets, but the UR5e proposal treats every sheet as one unchanged fixture; before we inherit its correction routine, I want to know which brackets actually used which locating arrangement.

11 条回复

GR
GraceAdams0146

Can the original setter tie that change to a traveller or fixture revision? I'd ask before anyone averages the results together.

7分
CA
CallumChen1143

Setter remembers the change but not the first traveller; the note names a new stop drawing, and the inspection sheets keep the old fixture name.

6分
AN
AnnaBennett0764

Use the dated drawing and service entry to narrow the period, but keep any bracket whose configuration cannot be identified separate. The old fixture name may have stayed unchanged while the locating contact moved.

16分
DI
DineshAdams0125

Was the new stop actually fitted when the note was written, or was that only the instruction to make it?

13分
CA
CallumChen1143

Instruction to make it; toolroom has a later issue entry, and maintenance is looking for the fitting record rather than treating the drawing date as installation.

22分
YA
YasminBrown0876

Worth doing. A proposed improvement can sit in a folder long before it touches a bracket, especially if somebody still has to release the fixture for the work.

8分
GR
GraceAdams0146

What about the restrained and released readings in the meantime? Do they at least stay linked to their own brackets?

12分
AN
AnnaBennett0764

Grace, yes, keep those links. A missing fixture revision should not turn genuine measurements into rubbish; it limits which configuration they can describe.

15分
CA
CallumChen1143

The bracket identities and checking supports are intact, Grace; maintenance also found the fitting record, which places the stop change between two identified orders.

22分
DI
DineshAdams0125

That sounds useful; can the proposal show the two order groups separately, with fit-up, restrained observations and released results kept in their actual stages?

20分
CA
CallumChen1143

Yes, I am rebuilding it that way, with correction operations still attached to their own brackets; the fixture review can compare the two groups without pretending the stop change explains every failed dimension.

15分