Would you propose the next insert if somebody else had made all the earlier ones? I ask because it's easier to count the next bit of work honestly when you aren't trying to rescue your own last few weeks.
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
How much pouch preparation justifies another insert?
AmaraBrown0948 · 2025年5月21日 15:09 UTC
13 条回复
Probably not. That's uncomfortable.
-2分Fair enough. Put the next order on paper from bags arriving to trays leaving, with your preparation in the hours. You don't have to decide the fate of the whole idea before you can refuse one poor next step.
6分Preparation wasn't in our comparison. Only time at the robot.
17分Could you use your actual preparation notes to add it back? Rough hours with their source would be more useful than another guess. Some old time may be impossible to recover.
8分I have job cards for the inserts. Enough to show the scale, at least.
17分Who makes the next insert when you are away?
11分That's worth answering before the next trial. I once helped redesign a station around one very accommodating technician, then realised we'd made their helpfulness part of the equipment specification. Nobody had budgeted a second person who knew all the adjustments.
6分Nobody else currently. Supervisor agrees we should pause new pouch variants.
4分We kept a single repetitive order after a trial like this and dropped the mixed work. Worked better for us, but only after another operator could set it up without the original programmer hovering. Does one of your orders deserve that smaller trial?
14分And what happens to the manual packing space while you decide? The operators still need somewhere sensible to do the orders you've paused.
2分Manual bench restored. One repeat pouch stays under review. No more inserts authorised meanwhile.
12分Let the packers help choose what to test on that repeat order. They've probably seen the difficult bags you spend time persuading into position.
14分讨论已关闭
此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .