简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

Our FR10 vacuum report starts after the panel was separated

AndrewBlair · 2025年10月10日 23:52 UTC

已关闭
AN
AndrewBlair
One access panel seals. Ours arrive stacked. I still need single-panel confirmation and support through placement assessed.

1 条回复

LU
LucyCarter1002

Ask for the complete stack-to-destination assessment with representative panels, including any interleaves, separation, single-panel confirmation, supported shape through movement and release. Have them explain the response to an uncertain pickup. The loose-panel sealing result only covers a small part of that proposed job.

23

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .