reference-plate inspection handover stops at the FR5 main routine

MeiBaker0516 · 2026年8月1日 06:54 UTC

回复讨论
ME
MeiBaker0516
I'm trying to improve our FR5 fixture-inspection handover while the original integrator is still available. It's mostly pendant pictures with no revision, showing the main routine but not called programs, fixture assumptions or ordinary PLC signals. What would let the next maintainer follow the installed reference-plate job?

2 条回复

LO
LouisBarnes0572

Request the complete installed project with revisions and supported backup instructions, then trace a plate through called routines, expected process signals and approved recovery. Have another maintainer follow it.

8
ME
MeiBaker0516

The integrator supplied the project files and walked the normal path with maintenance. That exposed missing explanations for two waiting conditions, so I've left the handover open for those and recovery. Thanks, Louis; tracing the plate was much more productive than requesting another folder of screenshots.

-2