I'd ask the welder to show the decision, not just name the operation. We are untangling a similar missing step in a separate FR5 proposal. The final good result does not explain what happened before it.
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
The bracket passes after a step our training sheet skips
DavidBrown0954 · 2025年8月15日 20:25 UTC
18 条回复
He is still here. Says he looked across the two mounting faces after release and could spot the bad ones.
12分Take a sketch to that conversation. He can point at the faces he means instead of trying to turn years of habit into a neat sentence on demand.
4分Was there any gauge beside the press? Might help explain what he was looking for, though I would still ask him.
15分And ask quality how the press result was accepted. Or rather, where that check was recorded; the welder's selection and the final decision might have different owners.
1分Ella, I don't know about a gauge yet. Ada, quality signed the finished sheet. I've only got their final numbers.
7分Those numbers are still useful. Just keep the press step attached to them rather than presenting them as straight-from-fixture results.
4分Thanks, David. I was picturing a go/no-go check beside the press, but that is only a guess.
8分Keep a place for the press and its inspection work in the proposed route until the welding and quality people settle this; missing knowledge doesn't remove the work from the floor.
20分Jo, would you keep the old fixture as well? Ours is taking up space, but it is the only physical reference left for some of the notes.
14分Welder marked the two faces and showed the bench check. There is a comparison block, not a pass/fail gauge. He used it to see which way the upright leaned.
20分That sounds much easier to explain to a trainee. Quality still needs to give you the actual acceptance method; the comparison block can show the concern without becoming the tolerance by accident.
14分Ada, I'd retain it until the relevant contacts and alterations are understood and captured, or agree an equivalent reference with the designer before clearing it; I wouldn't scrap the only answer to a question still open.
22分Thanks, Jo. I'll raise that with our space planner, separately from David's training sheet.
16分Quality has now pointed me to inspection instruction Q6. It measures the released bracket on its base face after correction. We're adding the earlier selection step as something the new trial must define.
7分Does Q6 say where a bracket goes if it still fails? That is the bit I would get stuck on mid-shift.
14分Yes, to the quality hold area. No second correction unless quality and fabrication agree it. I've put that on the draft sheet too.
16分Will a different operator try following the draft with you? You've learned a lot that may still be living in your head rather than on that sheet.
3分讨论已关闭