简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

Our 108-housing target is being met by inspection attempts

RebeccaBrown0952 · 2026年7月29日 14:15 UTC

回复讨论
RE
RebeccaBrown0952
The FR5 acceptance dashboard looks nearly finished after restart, but repeated inspections are inflating its count against our 108 labelled housings. Failed checks can have reviewed retries. How do I count accepted items accurately while retaining every attempt and its outcome?

10 条回复

RO
RobinChan1121

Build the accepted total from identified items with an authorised accepted disposition, not the number of completion messages. Keep attempt records linked beneath those items.

14
EM
EmmaArcher0376

And agree what establishes that disposition. A failed attempt followed by any later completed check isn't automatically an accepted housing; the retry result and review still need their proper meaning.

4
RE
RebeccaBrown0952

Item labels are available and retries have separate review records. The dashboard currently increments on each completed inspection, which is why repeated attempts look like extra production.

22
TH
TheoAllen0323

What happens to an attempt with a missing or unreadable item label? It shouldn't be assigned to the nearest housing just to get the reconciliation finished. Leave those rows visible for someone who can actually resolve them.

21
RO
RobinChan1121

Yes, unmatched stays unmatched. Also test replaying one completion twice and restarting with the real saved attempt history, not an empty convenient counter.

6
RE
RebeccaBrown0952

I've drafted an item-level count with unresolved identities separate and failed attempts retained. Quality is confirming the disposition rule before we recalculate the batch. No manual reduction of the counter to a guessed number.

9
EM
EmmaArcher0376

Preserve the old reported total with the reason it was wrong. Correcting the dashboard should make the audit trail clearer, not quietly replace the original report and leave people unable to explain why progress went backwards.

12
TH
TheoAllen0323

Will the ordinary screen show both accepted items and the unresolved work? I'd rather see a smaller honest total than one that makes the next shift think only a couple of housings remain.

17
RE
RebeccaBrown0952

That is in the screen draft. Recalculation and restart tests are pending the confirmed disposition rule; the old total is marked attempt-based and unsuitable as batch progress, with its history retained.

4
RO
RobinChan1121

Include an item failing then passing a reviewed retry in those tests. It should contribute one accepted item while still exposing both attempts and the review.

20

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。