I'm testing our inspection-cycle tracking tracking offline for a setup using Fairino FR5 in a sample inspection setup with recorded job events, with a fixture-mounted plate as a reference. An earlier attempt's completion incorrectly completes a newer attempt if I deliver it after that attempt starts.
I need repeatable delayed and duplicate event tests because the random sleeps aren't reliable.
@GraceBrown0929 Save the exact event order. Does your handler match the completion by attempt identity, or just the job label?