The UR5e quote grew a second operator

KaiBell0628 · 2025年9月14日 10:25 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

KA
KaiBell0628
Our carton-pocket proposal looked affordable until tray preparation appeared as customer labour. Two suppliers include different bits. How do I compare the whole packing job?

20 条回复

FE
FelixChan1067

Give both suppliers the same start and finish for the job, including replenishment, carton changes and recovery. Then ask them to mark what they supply and what your people must do.

16分
KA
KaiBell0628

One starts with boxed kits already arranged. The other starts with kits in shipping cases.

-2分
LE
LeoChan1058

There is the first mismatch. The cheaper number may still be a useful option, but it buys a smaller job. Get the preparation cost beside it before ranking anything.

8分
KA
KaiBell0628

Agreed common boundary: open shipping case to filled carton. Both revising scope.

15分
CH
ChloeAbbott0048

Who opens and puts away the empty shipping cases? Not being fussy for sport; those little tasks are exactly how an apparently spare operator ends up unable to leave

9分
JU
JuliaAllen0326

Does that boundary include all boxed-kit variants, with their actual shipping-case arrangements? A shared sentence will not make the comparison fair if one supplier prices only the easiest variant.

14分
KA
KaiBell0628

Chloe, operator handles empty cases. Julia, three variants, all drawings and packing samples supplied.

17分
RE
RebeccaBell0691

Training needs a common scope too, including both shifts and recovery, otherwise one offer may only cover a demonstration to whoever happens to be there

23分
EM
EmmaBrooks0811

I wouldn't insist both suppliers solve preparation the same way. One manual step might be sensible at your volume. I mean cost it honestly, not declare manual work a failure before comparing it.

7分
LI
LinBennett0705

What volume and changeover frequency are they pricing? That decides whether elaborate preparation equipment earns its keep.

21分
KA
KaiBell0628

Short orders, two kit changes most shifts. Nobody gets a full shift of one variant.

1分
LE
LeoChan1058

Then Emma's point is strong. Compare complete labour and elapsed order time, but don't make identical equipment a condition. You might otherwise spend more to avoid a small task people already handle well.

21分
FE
FelixChan1067

Rebecca, would you count refresher training separately from the initial handover? We often discover the second shift only had somebody explain the buttons during a quiet moment.

12分
RE
RebeccaBell0691

Felix, yes, but first get both shifts into the initial scope; refresher cover and training future starters can then be separate named items rather than an implied lifetime service

11分
KA
KaiBell0628

Revised scopes include both shifts. Supplier one offers manual preparation; supplier two proposes equipment for it.

3分
JU
JuliaAllen0326

Have you timed manual preparation of those three variants over a complete order? That gives you a cheap baseline before deciding what the proposed equipment needs to improve.

16分
CH
ChloeAbbott0048

And try the awkward shipping case, not just the newly opened top row. We teach lovely loading exercises from neatly presented parts, then wonder why the real bench has nowhere for the cardboard

-2分
KA
KaiBell0628

Baseline booked with our packer. Thanks, Julia. Guarding and application assessment costs are still provisional in both offers.

7分
EM
EmmaBrooks0811

Keep those provisional lines visible. You can compare what you know without quietly treating the missing amounts as zero. Also useful to ask what information each supplier needs to firm them up.

18分
LI
LinBennett0705

Did either supplier explain its outstanding assumptions? I'd want those before choosing even a provisional favourite.

1分

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .