I helped teach our FR5 sleeve-unloading job and wrote the startup sheet. Empty pocket? Interrupted run? Call Henry, apparently. That's the sheet failing, not the operators. I need to document those decisions properly

7 条回复

JO
JoFixtures

Sit with the operators and list the actual interruption states first; a recovery sheet based on what you remember designing can miss what they really encounter.

16
HE
HenryBarnes0525
回复 JoFixtures

They listed an occupied destination pocket too. I'd only thought about missing source parts. That's already one reason to stop writing this alone.

6
JO
JoFixtures

Exactly, and somebody has to own the decision when the physical part location and the saved job position disagree; don't bury that under a generic restart arrow.

24
HE
HenryBarnes0525
回复 JoFixtures

We're adding visible symptoms, the approved response and escalation contact per state. Ambiguous part location goes to the designated lead. Need controls to approve the recovery paths before training.

13
JA
JamieBell0643

Let an operator explain the draft back using the screen they actually see. I cannot judge your recovery logic, but unfamiliar status names can make a correct sheet unusable

11
HE
HenryBarnes0525

Did a desk walkthrough with two operators. They spotted three labels that don't match the display. Fixed those; practical recovery training is still waiting for the approved procedure.

12
JO
JoFixtures

Give the escalation contact a backup as well; otherwise you've replaced 'call Henry' with one different person who will eventually take a day off.