Our handover for inspection-cycle coordination with Fairino FR5 in a maintenance review of a commissioned inspection cell, using a machined bracket, is mainly pendant screenshots. I'm trying to improve it while the original integrator is available. The pictures lack revision details and cover the main routine without its subprograms, fixture assumptions or expected ordinary PLC signals
@LinBell0618 I've matched our installed revision to an export. Some screenshots belong to an older copy, though. That explains the names that weren't lining up
@RosaCarter0988 Build a call map from that export and list external dependencies with their owners. That should give maintenance what it needs to follow the program.
Fair distinction. I meant understanding the dependencies, not choosing a restart point. Recovery needs its own approved reference from the responsible integrator.
Our dependency entry will identify the relevant controlled reference and owner, with unresolved revision details marked explicitly instead of left for the reader to infer
I've settled the handover structure: start from the matching export, map dependencies and identify their owners. I'll count it operationally ready only after the responsible integrator verifies the references, including recovery