简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
I priced the UR5e and forgot the people
ZaraArcher0395 · 2025年5月5日 09:49 UTC
已关闭My spacer-loading estimate covers the robot and gripper. Fixture work and staff time are guesses. Small pilot possible?
4 条回复
Price one defined variant first. Your fixture can't be quoted against 'some spacers'.
5分One variant picked. Operator is helping time the current job, including setup.
20分Good. Include clearing away too. Work doesn't end when the last part lands.
11分Added. We have a manual baseline now; waiting for the fixture quote before proposing the pilot.
6分讨论已关闭
此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .