What does reset refer to in that note? Repositioning for a measurement and physically correcting the bracket could both get called that. I'd ask the author before copying it into the proposed work sequence.
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
Bracket reset hidden inside our FR5 fixture notes
VictorAllen0272 · 2025年12月24日 21:50 UTC
17 条回复
I'd also ask where the bracket went between those checks, Victor. In our estimate the correction bench appeared as though it was next to everything else, and the preceding inspection and queue had been left out. Even an honest description can make a whole job disappear if nobody follows the part.
5分Jasper, author can't be reached; Isaac Baker, only the final inspection station is named, so the trip in between is missing too
21分I've got a similar unresolved entry on a marked bracket: a released failure and a later pass, but I couldn't find whether it had been corrected. I was tempted to call the later number a repeat measurement because that was the tidy explanation. It wasn't in the sheet, though. I'd leave your reset as an unanswered question rather than choosing whichever meaning makes the proposed fixture easiest to sell
3分Pavel, did you have the actual bracket or only its sheet?
20分Victor, before this becomes a fixture argument, which drawing revision were those old checks against? And are the supports for the released check described? Both can get lost behind a perfectly legible final number.
22分A plausible reconstruction can be useful at a review. Just label it as one and don't put it in the operator sequence. Otherwise the person asked to follow it becomes your first test of what 'reset' meant.
14分I'd start with the old fixture list if there is one; it may identify the measuring support cheaply, although owning the listed fixture wouldn't establish that it was used for this bracket.
24分Who would own correction if the proposed job needs it?
1分Ada, the bracket was identified to the records, but that still didn't tell me what happened before its later pass. I can't fill in that part of the history from the piece alone
7分Isaac Archer, revision B, same as this proposal; released supports not stated. Caleb, fabrication owns any correction, inspection decides acceptance. Neither has agreed a routine from this old note
9分Then bring both into the review before the estimator treats correction as a free service. Fabrication may have the skill but still have other work, and inspection may need the piece presented differently from the welding fixture's held position.
18分Fair enough, Pavel. Having the piece doesn't give you its missing afternoon.
13分Colin's fixture list idea might help with one gap. Victor, I wouldn't wait indefinitely for the old author before getting a current bracket observation agreed; the missing explanation may stay missing.
6分Found two inspection supports on the old list, neither linked to this entry; agreed with quality to plan current fit-up, held-location and released checks separately
4分Keep the part identity through any correction and later check too. Your three planned stages are useful, but the exact gap you're trying to understand sits after the released failure.
21分Yes, correction and reinspection stay linked if needed; old reset isn't becoming an instruction, and the trial hasn't happened yet
23分讨论已关闭
此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .