The PLC emits a brief job request for our sample housing. The application sometimes reads after it has cleared. Neither author's interface note says who owns the request until receipt or how an unanswered request is reported. I want those decisions agreed before changing timing. This is the ordinary inspection interface, separate from the engineered safety functions.
Our FR10 request disappears before the inspection application sees it
LinBell0618 · 2026年1月15日 15:33 UTC
主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文
1 条回复
讨论已关闭
此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .