Our support ticket stalled on an unexplained confirmation input. Ask for the expected ordinary PLC states beside those screens, including what makes that fixture selection valid.
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
our ur5e inspection handover starts after the fixture setup has happened
RobinBarnes0599 · 2026年4月8日 21:42 UTC
21 条回复
The only labelled state is inspection busy. The screenshot already shows the selected fixture name. Nothing explains where it came from.
17分Get the program dependencies as well as the screen explanation. The fixture name could come from a setup routine or retained configuration, and neither is visible in a picture of the main routine.
22分Ask the integrator to identify the installed program set and the configuration it expects. Then compare the actual handover contents against that inventory. A large folder can still be missing the one file the next maintainer needs.
1分How does the covering operator find the right job?
22分Liam, a named shortcut. Integrator supplied the dependency list: an initialisation routine selects a fixture configuration before the main routine. That routine is absent from our handover export.
22分Does that initialisation routine contain the configuration, or read it from another file? Worth asking before they send one missing routine and call the folder complete.
15分And is the selection retained between starts? I'm asking because the screenshot might show yesterday's choice rather than what that shortcut selected.
11分Alex, a separate configuration file. Nina, the selected name is retained, but initialisation validates it against that file. Both were missing from the supplied inventory's attachments.
12分What happens on a start with no retained selection?
7分Have the author explain that state. Do not turn the visible name in the screenshot into a default setting to fill the gap; the installed validation logic needs to remain part of this handover.
9分This is where our old bench notes fell over. The writer had used the same fixture for months and thought its name was just part of the screen. We rebuilt the PC and suddenly the first page of the notes described a state we couldn't reach. Nothing exotic had failed. A setup file had lived outside the backed-up folder, and only one person knew it existed. Robin's dependency list is worth finishing before anyone pretties up the pictures.
21分Matching initialisation routine and configuration file supplied, with their revisions. Author confirms no retained selection leads to a selection-required state. That case is now included in the handover.
14分Can someone unfamiliar follow it from that state?
19分Give them the ordinary empty-fixture and uncertain-coupon cases too. A clean start is only one place the screen can leave someone wondering what it wants.
16分The draft walkthrough exposed another gap. The covering technician could select the fixture but could not tell whether a retained pending coupon meant uninspected or outcome unknown.
2分Who can resolve the unknown outcome? The instruction should name that responsibility alongside what the operator sees, rather than asking them to infer it from the pending label.
8分Nina, your awkward-case suggestion earned its place. Robin, keep those two meanings separate in the revised wording; a covering person shouldn't have to decode the program history to choose a next step.
19分The application owner resolves the uncertain outcome. Revised wording distinguishes it from known uninspected work and gives the contact and hold instruction. No automatic resend added.
8分Repeated walkthrough passed from no selection, ordinary empty fixture and uncertain coupon. The technician found the matching program and configuration revisions in the handover. Missing files and missing decisions both closed.
8分