The complete held-blank assembly through approach and withdrawal, with opening and empty return where the intended sequence requires them, against the measured door and fixture; include the setter's access so the selected position does not solve the robot route by taking away the person's working space.
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
Which complete-tool view should replace our FR5 fixture-exchange arrow?
ThomasBrooks0799 · 2026年1月25日 18:15 UTC
The FR5 proposal reaches our aluminum blank with an arrow. Its gripper and the open machine door are absent. I have asked for the actual door survey before another arm comparison. What should the integrator show at the exchange, not just at the final pose?
4 条回复
讨论已关闭