What was inspected on this FR5 apart from its paint?

LuisBrown0956 · 2025年10月2日 03:57 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

LU
LuisBrown0956
A customer is considering a refurbished FR5 for loading plastic spacers into trays. I have been asked to arrange collection. The listing says inspected but gives no test scope or package identities. I want those settled before transport gets booked. What would you request first?

17 条回复

JA
JasperBrown0899

Get the actual package identities and itemised contents before discussing collection.

20分
LU
LuisBrown0956

The seller sent readable arm and controller labels. The controller differs from the one shown in the original listing. Pendant and cables are still described only as included.

10分
JA
JasperBrown0899

Ask why the controller changed and what checks cover that supplied combination.

11分
AD
AdaBell0651

And ask for the inspection results, not just another inspected label.

17分
LU
LuisBrown0956

They say the first controller was a display item. The offered controller now has an identified functional test sheet, but the sheet lists no arm identity. I have asked them to connect the records.

11分
AN
AnikaChan1117

Hold the transport enquiry until they answer. Otherwise the easy bit gets booked and everyone starts treating the equipment decision as already made.

20分
LU
LuisBrown0956

Collection is unbooked. Customer agrees that we need an equipment assessment first. The attractive price still interests them, but I have separated that from the cost of making this useful in their cell.

6分
AN
AnikaChan1117

Good. What does their refurbishment claim actually cover? Cleaning and a changed controller would be a rather different purchase from an overhaul with a work list.

19分
LU
LuisBrown0956

Their work list covers cleaning, one cable replacement and inspection. It does not claim a general overhaul. The listing's heading was doing more work than the detail underneath.

18分
PA
PavelCarter0962

Will the seller permit an independent assessor to examine the identified package before your customer commits to buying it, with the visit scope agreed in advance? That would make the assessment cost easier to justify.

10分
JA
JasperBrown0899

Include support terms and any unresolved findings in that enquiry.

11分
LU
LuisBrown0956

They permit assessment before purchase. Our assessor has proposed a scope and asked for the linked arm/controller test record. Support terms are back, including where paid repair work would be handled.

4分
AD
AdaBell0651

Does the contents list name the replacement cable now?

0分
LU
LuisBrown0956

Yes, Ada. It names the cable and the other included items. The seller has also supplied the missing arm identity against the test record. Assessor is reviewing the documents before agreeing the visit.

5分
AN
AnikaChan1117

Has the customer allowed for tooling and integration as well as that visit? None of this used-package checking demonstrates the spacer-loading job yet.

15分
LU
LuisBrown0956

They have. The budget now separates purchase, assessment, transport and the application work. Assessor has agreed the visit scope with the seller; no visit result and no purchase decision yet. Thanks for keeping the contents question ahead of collection.

12分
JA
JasperBrown0899

Please post what the assessment finds.

23分

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .