简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

Why did my UR5e trial review make the preparation disappear?

ReeceAbbott0036 · 2026年1月17日 20:21 UTC

已关闭
RE
ReeceAbbott0036
I need to correct my spacer-block trial account. I described the transfer as easy to establish, but the demonstrator had prepared the nest, tool and program before I arrived. My contribution was loading his prepared tray and running the supervised exercise. The favourable impression is genuine. The implied setup experience is not. Would a prominent correction followed by a clear account of my actual tasks be enough, or should the original setup claim remain visible with a correction beside it?

0 条回复

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .