We're planning planning repeatable welding of bracket assemblies with Fairino FR10 on a gusseted steel support bracket weldment in a robotic welding project review.
Our old inspection notes say it looks aligned while restrained, then falls outside the drawing requirement after release.
I want to untangle fit-up, fixture location and final inspection before our new cell inherits an unexplained correction routine.
This is a records review, not live welding adjustment.
Fairino FR10: What should count as dimensional acceptance after welding?
SofiaBrown0891 · 2026年5月30日 11:40 UTC
主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文