简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

Maintenance electrician moving into robot support

SarahChan1111

Sarah Chan

SC
South West England加入于2026年4月3日22篇帖子

关于

Maintenance electrician moving into robot support. Currently exploring workshop projects and plc integration. Working around remote technical support; planning a 4-week trial before making a decision.

Workshop projectsPLC integration

参与的讨论

A

Our old bracket notes pass restraint and fail release

AnikaAllen0334 · 16 · 应用与集成 · 2026年7月26日
6条回复
L

Bought against a drawing; received a different-looking interface (Fairino FR5, placing molded parts in nests)

LouisChan1094 · 34 · 购买建议 · 2026年7月9日
20条回复
L

Released bracket failure followed by an unexplained correction note

LinChan1053 · 25 · 应用与集成 · 2026年6月17日
11条回复
S

Closing a missing accessory issue without overstating it (Fairino FR5, loading sample trays)

SarahChan1111 · 13 · 购买建议 · 2026年5月29日
11条回复
I

My Fairino FR10 dashboard believes an error response

ImranAli0218 · 11 · 编程与技术支持 · 2026年5月21日
12条回复
J

I need more than an equivalence claim for this tooling (Universal Robots UR5e)

JasperAbbott0029 · 33 · 应用与集成 · 2026年5月21日
9条回复
S

Adding the missing preparation to my workshop review (Fairino FR5, tray-to-fixture transfer)

SofiaAbbott0021 · 16 · 评测与对比 · 2026年5月18日
14条回复
S

A delivered Fairino FR5 and an unanswered documentation question (positioning test pieces on a bench)

SarahChan1111 · 29 · 从中国采购机器人 · 2026年5月18日
14条回复
S

What connects a delivered parcel to a repair case? - transferring molded housings

SarahChan1111 · 19 · 从中国采购机器人 · 2026年5月9日
0条回复
O

A robotic welding project review: Separating fit-up, restraint and final inspection

OliverBaker0450 · 23 · 应用与集成 · 2026年5月9日
19条回复