Our old bracket notes pass restraint and fail release

AnikaAllen0334 · 2026年7月26日 06:22 UTC

回复讨论

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

AN
AnikaAllen0334
I'm reviewing records for an FR10 bracket proposal. How do I separate fit-up, locating and released acceptance before inheriting correction work?

6 条回复

SA
SarahChan1111

Does the final acceptance record come before or after that correction?

0分
AN
AnikaAllen0334

After it. I have no dimension recorded between release and correction, only the failure note.

-1分
FA
FarahAli0243

That limits what the final result tells you. Ask the original process owner what was corrected and how the released assembly was supported for measurement. I would not assume the restraint check uses the drawing's acceptance method.

17分
SA
SarahChan1111

Are there untouched samples left? They might help identify the recorded condition.

8分
FA
FarahAli0243

Only if their identity and process stage are known, Sarah. A loose bracket from the shelf could already have been corrected. Useful to ask, but I would keep an unidentified sample out of any firm comparison.

15分
AN
AnikaAllen0334

No traceable untouched samples found. Process owner hasn't answered yet. I cannot price correction out of the proposal.

7分