Can I judge this spacer pilot without buying the FR5 first?

HassanCarter0965 · 2026年3月17日 12:43 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

HA
HassanCarter0965
I've priced an FR5 and gripper for loading our machined spacers. My colleague asked who builds the nest and covers his ordinary work while he does it. Fair question, though the meeting went downhill from there. Can I get a useful first decision from the spacer job we've already got, before asking him to design anything?

9 条回复

IS
IsaacBell0694

Yes. Start with the actual loss you want to remove. If loading is a small part of the job, a beautifully automated loading step may leave the same queue. Fixture work should have an owner and estimate before you spend on hardware.

18分
AN
AnikaChan1117

I'd still pay for a small fixture feasibility check if that is the big unknown. Counting the current job won't tell you whether the spacer can be presented reliably.

16分
HA
HassanCarter0965

Loading isn't the whole delay. He spends more time finding the right tray than putting spacers into the fixture. I hadn't included that in my little saving calculation.

18分
IS
IsaacBell0694

Then observe tray supply as well. Anika, a bounded feasibility check could help, but Hassan hasn't yet established which problem deserves that money.

11分
LU
LuisBrown0956

I inherited a small loading trial where the robot waited for trays beautifully. The person who had previously carried them over was also doing inspection, and the proposal had quietly allocated that person elsewhere. We ended up changing the tray route before touching the robot work. Your colleague may be guarding more than his fixture-making time. Ask him what he stops doing when he feeds this pilot.

4分
HA
HassanCarter0965

Asked him. Inspection, exactly. Thanks Luis. He'll walk one ordinary spacer order with me; I've agreed it happens in work time with cover, not as a favour after hours.

11分
AN
AnikaChan1117

That changes my answer. Spend the first money on understanding that handoff, not on a nest for a job nobody can keep supplied.

3分
IS
IsaacBell0694

And use the order you actually observe. Don't annualise the busiest ten minutes and call that the normal saving.

14分
HA
HassanCarter0965

We've deferred the robot purchase. That order spent longer waiting for inspection than being loaded, and a labelled tray shelf removed one of the searches. There's still a job here, but not the arm-saving story I sold him.

7分

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .