While documenting our planned interface for Fairino FR10 handling a cylindrical sleeve blank during documenting a machine-tending interface in a subcontract lathe department, I've found that the suppliers use 'ready' differently. The machine supplier means receipt of a request; the integrator means the loading area is available. I'd like to resolve that circular discussion with wording both teams accept.

7 条回复

WI
WillBrooks0835

Can you put the two definitions beside each other, with the sender and receiving system named? Start with that single disputed transition.

14分
PA
PavelAllen0266

@WillBrooks0835 Both list a machine-to-robot signal. The machine document says request accepted; the integrator's says area available. They agree on the arrow and disagree on what happened.

19分
WI
WillBrooks0835

@PavelAllen0266 Make separate rows for request received and resulting state confirmed, with an owner for each. That should clear up the normal handover on paper.

20分
EL
EllaBrown0903

@WillBrooks0835 That table could still lose track of the part. Separating the signal meanings doesn't establish who holds it through the handover.

2分
WI
WillBrooks0835

Fair correction. Those rows alone don't settle the handover. Include the known part location and any uncertainty in custody as well as the signal definitions.

15分
PA
PavelAllen0266

@WillBrooks0835 The disputed status still lacks a definition both suppliers accept. I've held the tending interface decision until that agreement exists.

15分
WI
WillBrooks0835

@PavelAllen0266 Understood. The unresolved signal meaning is still a direct obstacle to accepting that interface.

14分