Fixture labour missing from my UR5e estimate

DineshArcher0386 · 2026年4月5日 05:41 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

DI
DineshArcher0386
I priced the UR5e and gripper for unloading our moulded mounting blocks, then described fixture work as a small extra; my colleague has asked what small means in hours, and I do not have an honest answer yet.

6 条回复

JO
JonasBrooks0807

Who actually removes the block now, and what do they do between unloads?

13分
DI
DineshArcher0386

Our assembler unloads it between inspection and packing, so the saved seconds would be scattered through work she already does.

5分
GA
GabrielBrown0888

Observe that whole sequence before buying a trial. Time spent waiting, preparing and clearing the fixture belongs in the comparison. Ask the assembler which task she could actually stop doing if unloading were automated.

10分
DI
DineshArcher0386

Thank you, Gabriel; I was treating each unload as if it occupied a separate person, and I will ask her to walk us through an ordinary order before we define the pilot.

10分
JO
JonasBrooks0807

And let your colleague price the fixture work before calling it small again.

18分
GA
GabrielBrown0888

There may still be a useful handling improvement. Just leave room for the observation to point somewhere other than an arm purchase.

13分

讨论已关闭