Fixture labour missing from my UR5e estimate

DineshArcher0386 · 5 Apr 2026, 05:41 UTC

Closed
DI
DineshArcher0386
I priced the UR5e and gripper for unloading our moulded mounting blocks, then described fixture work as a small extra; my colleague has asked what small means in hours, and I do not have an honest answer yet.

6 replies

JO
JonasBrooks0807
Replying to DineshArcher0386

Who actually removes the block now, and what do they do between unloads?

13points
DI
DineshArcher0386
Replying to JonasBrooks0807

Our assembler unloads it between inspection and packing, so the saved seconds would be scattered through work she already does.

5points
GA
GabrielBrown0888
Replying to DineshArcher0386

Observe that whole sequence before buying a trial. Time spent waiting, preparing and clearing the fixture belongs in the comparison. Ask the assembler which task she could actually stop doing if unloading were automated.

10points
DI
DineshArcher0386
Replying to GabrielBrown0888

Thank you, Gabriel; I was treating each unload as if it occupied a separate person, and I will ask her to walk us through an ordinary order before we define the pilot.

10points
JO
JonasBrooks0807
Replying to DineshArcher0386

And let your colleague price the fixture work before calling it small again.

18points
GA
GabrielBrown0888
Replying to JonasBrooks0807

There may still be a useful handling improvement. Just leave room for the observation to point somewhere other than an arm purchase.

13points