old bracket sheets disagree about when 'pass' was measured

John_Cook · 2026年9月4日 14:20 UTC

回复讨论
JO
John_Cook
I'm reviewing records for our UR5e welding proposal. 'Pass' sometimes means clamped, sometimes released. Poor inheritance.

6 条回复

LU
LuisBarnes0608
回复 John_Cook

Separate those measurement conditions before drawing a trend. A clamped alignment check and final inspection may answer different questions, even if both were labelled pass.

18
JO
John_Cook

Some sheets say neither. The old correction note just says 'pull into fixture'.

16
LU
LuisBarnes0608
回复 John_Cook

That note is not a transferable process definition. Identify what is unknown rather than asking a new operator to reproduce an undocumented correction by feel.

14
RA
RaviAbbott0041
回复 John_Cook

Photograph the current fixture and identify its revision in the review. The old sheets may describe different stops or supports. And keep final acceptance tied to the drawing's specified inspection conditions.

9
LU
LuisBarnes0608

Include incoming fit-up observations where they exist. Otherwise all variation enters the discussion at the fixture, simply because that is where the old records begin.

6
JO
John_Cook

I've marked unknown conditions explicitly. No correction routine goes forward from these sheets alone.

10

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。