Our vacuum-tool report confirms a seal on one flexible stainless cover panel. We receive a stack. I have already learned to count manual preparation on another trial, so this time I want the panel separation and any support during transfer included before calling the handling concept complete.
Ask for the intended stack-to-fixture sequence, including how a second panel or failed separation is detected and handled. Somebody must own those cases, not leave them to the person beside the cell.